,

Duleek Chandelier

£987.36

Free UK Delivery over £75

Delivery Times (approx)

  • Instock 2 - 3 days
  • Lights 10 - 15 Days
  • Spares 5 - 7 Days
Guaranteed Safe Checkout

Product Description

The Duleek is a modern chandelier featuring eight lamp holders around its outer ring that can be adjusted in any direction. Central to the Duleek chandelier is its 600mm black steel ring. Eight brass sleeves radiate from the centre of the Duleek chandelier and pass through and beyond its outer ring. Each brass sleeve holds a brass lamp holder on a 360° swivel joint allowing it to be positioned in any direction. The chandelier’s black steel ring is suspended from three brass rods and chain attached to the supplied ceiling rose above. The Duleek chandelier is available in antique brass, antique silver, polished brass and satin brass. Bulbs are sold separately.

Additional Information

Weight10 kg
Dimensions71 × 55 cm
Finish

Antique Brass, Antique Silver, Polished Brass, Satin Brass

Approx. Delivery

Expected Delivery 21 – 28 Working Days

Protection

Class I IP20

No. / Type Bulb(s)

8 / E27 / 60W

Material

Brass

Reviews

There are no reviews yet.

Be the first to review “Duleek Chandelier”

Christmas Last Orders & Deliveries

Brands

Mullan Lighting :

  • Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Burford Lights :

  • Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
  • Any Items in Stock will be shipped within 2 -3 days up to Friday 19th December.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Sollux Lighting:

  • Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

All factories are closed over the holiday period - returning from Monday 6th January 2026

We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.

Scroll to Top