-10%

Midas Designer Gold Leaf 40cm Pendant

Original price was: £459.00.Current price is: £413.10.

Free UK Delivery over £75

This light is made for you - Delivery 10 - 15 days

£

Delivery Times (approx)

  • Instock 2 - 3 days
  • Lights 10 - 15 Days
  • Spares 5 - 7 Days
Guaranteed Safe Checkout

Product Description

Industrial Aesthetics

The Midas designer gold leaf pendant is a stunning 40cm addition to your interior decor. With its sleek, powder-coated matte black finish, it perfectly complements the industrial look while adding a touch of elegance.

Unique Design Features

This pendant light features a spiral cut, casting intricate shadows onto the ceiling. With a height of 20cm and a diameter of 40cm, it creates a captivating ambiance that elevates the overall atmosphere of any room.

Perfect for Various Spaces

Whether used in your living room, dining area, or workspace, the Midas pendant is ideal for enhancing your environment. Embrace the industrial vibe but with a refreshing twist – bring home this exquisite piece today!

A Larger White version is available – The Goma

Additional Information

Finish

Matt Black

Christmas Last Orders & Deliveries

Brands

Mullan Lighting :

  • Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Burford Lights :

  • Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
  • Any Items in Stock will be shipped within 2 -3 days up to Friday 19th December.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Sollux Lighting:

  • Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

All factories are closed over the holiday period - returning from Monday 6th January 2026

We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.

Scroll to Top