Product Description
Durable Design for Every Environment
The Ross bulkhead light is a versatile nautical-style fixture suitable for both wall and ceiling installations. With its IP65 rating, it is designed to withstand challenging conditions, making it perfect for industrial-style restaurants and pubs, or for any buildings where a safe exit is required during power loss.
Reliable Emergency Lighting
This innovative light features a 3W integrated LED emergency light that activates during power outages, providing up to three hours of illumination. Its design ensures that essential lighting is available when it’s needed most, especially near exit doors and corridors.
Stylish Finishes to Complement Your Space
Available in antique brass, antique silver, and raw brass, the Ross emergency bulkhead wall light combines functionality with aesthetic appeal. Measuring 26cm in height, 19.5cm wide, and 15cm deep, it seamlessly fits into various décor themes while ensuring safety and reliability.
Important specifications;
- Colour temperature: 5500k
- Battery duration: 3 hours
- Mains lumens: 151m
- Battery lumens: 107m
Cable is not provided with this product.
Christmas Last Orders & Deliveries
Brands
Mullan Lighting :
- Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Burford Lights :
- Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
- Any Items in Stock will be shipped within 2 -3 days up to Friday 19th December.
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
Sollux Lighting:
- Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
- Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
- You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.
All factories are closed over the holiday period - returning from Monday 6th January 2026
We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.
Reviews
There are no reviews yet.