Cream Burford Belfast Outdoor Wall Light

£84.00

Free UK Delivery over £75

This light is made for you - Delivery 10 - 15 days

£
- +

Delivery Times (approx)

  • Instock 2 - 3 days
  • Lights 10 - 15 Days
  • Spares 5 - 7 Days
Guaranteed Safe Checkout

Description

The Cream Burford Belfast Outdoor light with glass bulb shade can of course be used internally or externally, for an elegant look that will just add to your home.

Size: 23 cm diameter (over shade), 25 cm high (top of main light to bottom of glass dome), 29 cm overhang

For internal or external use, needs installation, rated IP44, takes a standard screw fitting bulb (E27) 40 watt or LED low energy bulb.

Note: Best installed by an Electrician, as installations vary depending on location mounting screws and terminal blocks not supplied any qualified electrician can install.

Optional Extras: Corner Bracket available in Same colour. (Black is shown), Stand alone motion sensor (PIR) all can be added to the order

For LED Bulbs go to Bulbs & Extras

Reviews

There are no reviews yet.

Be the first to review “Cream Burford Belfast Outdoor Wall Light”

Christmas Last Orders & Deliveries

Brands

Mullan Lighting :

  • Orders for Mullan Lights need to be made by Monday 1st December if you want them to be delivered before Christmas.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 2nd.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Burford Lights :

  • Orders for manufacture & delivery before Christmas, need to made by Wednesday 3rd December to ensure Christmas Delivery.
  • Any Items in Stock will be shipped within 2 -3 days up to Friday 19th December.
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

Sollux Lighting:

  • Lights in stock - will be shipped up to Friday 19th December - orders not in stock can be backordered, but may not arrive before Christmas
  • Any orders after that date will start manufacture but may not be shipped until early January. The factory will be on Shutdown until January 6th.
  • You can still order for January delivery, as all orders are dealt with in strict rotation - so earliest in - soonest out.

All factories are closed over the holiday period - returning from Monday 6th January 2026

We will be on limited service during the holiday period - however orders will be taken and put into the queue in strict rotation to ensure all is fair, deliveries will restart after 6th January.

Scroll to Top